Monday 22 March 2010

CORECTIONS - INTERFACES

On friday 19-3-10 we had our group meeting again from 1pm-5pm again with some feedback of my tutor I have corrected some of mistakes in the network architecture description. However I have to add screenshots of interface website in order to be easily the understanding. With cooperation of Alex who is doing the interfaces forms,we have design a draft of the main website and the sub-sites of the SQS company.I feel more OK with my work as the tutor was quite happy and the developed was appropriate.In the next meeting we shall add all the work together and we will check wherever each work match or not,doing the appropriate corrections.

Monday 8 March 2010

Network architecture update(description of hardware usage and proccess)

Group meeting:

When: Friday 5th March
Duration:1.00 pm-5.00 pm

I have updated the network architecture because of some very useful feedback I got from my tutor. However I have write the explanation of the network(on what each specific hardware,LAN and WAN do and how).

The network as it is now


The changes that I have done was on one of the workstation( South East )must located into the main office in Elephant and castle.South East workstation can connect directly to the LAN as it is faster and is based in the same building and not via private WAN through the router which is slower.What is more staff can interact with the system on-the-go,using their phones.This could happen after they access into the internet and sign in with their usernames and passwords into the company server).