Friday, 21 May 2010
Presentation day 21/5/2010
Thursday, 20 May 2010
3rd meeting 20/5/2010
Wednesday, 19 May 2010
2nd meeting for presentation 19/5/2010
Today we had our second meeting for the presentation from 11.00 - 1.00
We had finish the whole presentation and we had a practice in Keyworth bulding.We tried to contact Carl but we fail.
However we didnt know if we have to include his part as in the practice we had few minutes to present the presentation and we were just 3 of us.In addition because of the exams we couldn't do as much practice as we wanted to .
Next meeting:
Tomorrow 20/5/2010 we gonna have our 3rd meeting at 11.00 for practicing the presentation at keyworth bulding.
Present:
Christos
Alex
Danish
Tuesday, 18 May 2010
1st meeting for Presentation 7/5/2010
Thursday, 6 May 2010
Last meeting
Place :Faraday wing
We added the last bits of the team work in one document (final one).Fixed report format and saw if anything else is needed to be compleded or to added.
Team members present:
Alex
Christos
Senthuran
Everything gone upsolutly perfect.
Thursday, 1 April 2010
Screenshots from user interfaces (main page -PDA)
Monday, 22 March 2010
CORECTIONS - INTERFACES
Monday, 8 March 2010
Network architecture update(description of hardware usage and proccess)
Wednesday, 24 February 2010
Connection protocol - server specifications
Second group meeting for CISD assessment report No2
Yesterday we had a meeting again. Everybody were happy with the new network that I had design so we have start searching for our company servers.(type-specifications) We found the most appropriate servers for our network by looking their specifications and their cost as our company is a medium business which afterwards will be expanded.
The serves of our network so far:
Backup server: Dell Equal logic PS6000 XV ISCSI Array
Application Server: Dell power Edge M905 Blade server
Direct Server: Dell PowerConnect PC 3548
Architecture:
Applications + Data server (cluster architecture)
Backup Server (multicomputer architecture)
However we started the description of the network and we have finished the connection protocol part.
Meeting duration: 1.00-3.00 pm
Sunday, 21 February 2010
Network Design
When I saw the network we had designed, for a second time I realized that it was wrong, so because I am the person who must design the network for the next meeting I decided to design my own one according to the book SYSTEM ANALYSIS & DESING IN A CHANGING WORLD page 338. Below is the network diagram that I have designed in my pc. Again is not fully complete because we need to decide what software it must run the database server, the workstations PC and the web/application server. On the other hand the bellow network, in my opinion has the correct network architecture.
SCREENSHOT OF THE NETWORK (Not completed)
Saturday, 20 February 2010
First group meeting. CISD assessment report No2
First group meeting for CISD assessment report No2
Yesterday 19 February our group had done the first meeting .Everybody were present and everything gone right
We divided the work task as it is below
Christos and Dhanush:
- Major systems components
- Network architecture
- Applications architectures
Carl and Alex:
- Database Architecture
- A set of database tables
- A set of appropriate interfaces for key users
Meeting duration: 2.00-4.30
Decisions: We all have done a brainstorm about major components of our system and network architecture. We came across some networks designs and finally with the feedback of our tutor we draw a final one. However we decided our group name which is KOLOSSOS.